We are happy to come up with an article that is finally not just about mortar and concrete. In the meantime, we managed to complete the reconstruction of the interior of the brewery building, install and put into operation the production technology and complete the process of approval of the production facility by the authorities. We will look back at these activities and, for the sake of interest, publish a few articles with photos. At this point, however, we would like to focus on the fact that the first experimental brews took place in our brewery at the end of...
Construction activity in brief I.
Posted by Alexander Bocko on
Electricity, Old floor tiles removal, Stainless steel drainage channels, Aerated concrete blocks, New helpmate, Doors and windows, Work in full swing
- Tags: Brewery, Reconstruction
Main sewer pipe installation
Posted by Alexander Bocko on
In the next step, we placed sand on the bottom of the prepared trench and levelled it to the required slope. We cut a hole in the concrete tank for the pipe inlet and installed an inspection shaft near the building. Subsequently, we placed the main sewer pipe in the trench and covered it with sand and earth. First connection complete…
- Tags: Brewery, Reconstruction, Sewage
Cesspool installation
Posted by Alexander Bocko on
It is required to place something permanent in the beautifully excavated pit, which will move the pit to higher dimensions, open new possibilities, until now only in dreams imagined, please the builder's eye and fill a person suddenly surprised by different needs with hope. And so, the day came when the prefabricated tanks, after a long wait, triumphantly arrived from the manufacturer and, after sudden and tedious preparatory work, rested on the bottom of a space carefully prepared for them, as when a mother makes a cradle for her child. Serve faithfully you reinforced concrete cast sisters, bring light to...
- Tags: Brewery, Reconstruction, Sewage
Cesspool pit
Posted by Alexander Bocko on
Since sewage must be diverted or captured somewhere, the time has come to build a cesspool. We have opted for this solution for two reasons. Firstly, there is no public sewer system available in the village yet. Secondly, it is always safer to capture sewage from the factory where sanitation solutions are used in a cesspool, so that the pH value can be checked before being taken out and, if necessary, neutralized. The first step in the construction of the cesspool was the excavation of a pit into which the prefabricated cesspool will be placed.