Main sewer pipe installation
Posted by Alexander Bocko on
In the next step, we placed sand on the bottom of the prepared trench and levelled it to the required slope. We cut a hole in the concrete tank for the pipe inlet and installed an inspection shaft near the building. Subsequently, we placed the main sewer pipe in the trench and covered it with sand and earth. First connection complete…
Share this post
- Tags: Brewery, Reconstruction, Sewage