Main sewer pipe installation

Posted by Alexander Bocko on

In the next step, we placed sand on the bottom of the prepared trench and levelled it to the required slope. We cut a hole in the concrete tank for the pipe inlet and installed an inspection shaft near the building. Subsequently, we placed the main sewer pipe in the trench and covered it with sand and earth. First connection complete…

Main sewer pipe installation 01Main sewer pipe installation 02Main sewer pipe installation 03Main sewer pipe installation 04Main sewer pipe installation 05Main sewer pipe installation 06Main sewer pipe installation 07Main sewer pipe installation 08Main sewer pipe installation 09Main sewer pipe installation 10Main sewer pipe installation 11