Main sewer pipe installation
Posted by Alexander Bocko on
In the next step, we placed sand on the bottom of the prepared trench and levelled it to the required slope. We cut a hole in the concrete tank for the pipe inlet and installed an inspection shaft near the building. Subsequently, we placed the main sewer pipe in the trench and covered it with sand and earth. First connection complete…
- Tags: Brewery, Reconstruction, Sewage
Cesspool installation
Posted by Alexander Bocko on
It is required to place something permanent in the beautifully excavated pit, which will move the pit to higher dimensions, open new possibilities, until now only in dreams imagined, please the builder's eye and fill a person suddenly surprised by different needs with hope. And so, the day came when the prefabricated tanks, after a long wait, triumphantly arrived from the manufacturer and, after sudden and tedious preparatory work, rested on the bottom of a space carefully prepared for them, as when a mother makes a cradle for her child. Serve faithfully you reinforced concrete cast sisters, bring light to...
- Tags: Brewery, Reconstruction, Sewage
Cesspool pit
Posted by Alexander Bocko on
Since sewage must be diverted or captured somewhere, the time has come to build a cesspool. We have opted for this solution for two reasons. Firstly, there is no public sewer system available in the village yet. Secondly, it is always safer to capture sewage from the factory where sanitation solutions are used in a cesspool, so that the pH value can be checked before being taken out and, if necessary, neutralized. The first step in the construction of the cesspool was the excavation of a pit into which the prefabricated cesspool will be placed.
- Tags: Brewery, Reconstruction, Sewage
Main sewer pipe trench
Posted by Alexander Bocko on
In order to excavate trench for the main sewer pipe which connects the building with the cesspool we had to call for a serious mechanism. The pipe comes out of the building at a depth of 1.4 m and further down towards the cesspool to a depth of 1.6 m. A long time ago some other buildings used to stay on the part of the land which the pipeline passes through. These buildings were removed over time, but solid stone foundations were left in the ground. Fortunately, this complication did not surprise the excavator operator and he honestly coped with...
- Tags: Brewery, Reconstruction, Sewage
Sewer pipeline under technical room
Posted by Alexander Bocko on
After deepening the cellar space to the required depth, we dug out trenches, which we filled-up with 0-4 fraction backfill sand. We have then laid sewer pipeline in the sand. This pipeline is designated to serve technical room which will be established in this space over time. The main sewer pipe which drains the sewage from the entire building also passes under the technical room. A floor drain was planned to be placed in the middle of technical room floor. We installed this floor drain into its final position using dry concrete and connected it to the sewer pipeline pipe....
- Tags: Brewery, Reconstruction, Sewage, Technical room