Brew room

Cellar filling

Submitted by admin on Sat, 15.09.2018 - 14:39

Along with all the construction work being carried out during the reconstruction of the building, a fairly good volume of construction debris has accumulated. We sorted this debris and placed it to the part of the cellar, which must be filled up. Before that, we have concreted the windows in the cellar. At the top of the debris, we placed a layer of crushed stone, which will be later compacted, and a base plate will be constructed above it.

Reconstruction I.

Submitted by admin on Tue, 17.02.2015 - 23:19

Reconstruction of family house which should give shelter to brewery has begun. The first phase of reconstruction work is focused on the room which originally served as kitchen. After reconstruction brewing stand will be housed in this room. Removal of old oil paint which covered kitchen walls approximately as high as 1.5 meters (5 feet) above floor turned out to be the real challenge. Removal of original wall cladding was equally difficult. The work of tilers was apparently honest.